Major activities

  • Assessment of program municipalities in terms of Earthquake Risk and vulnerability
  • Preparation of Guidelines and training manuals
  • Preparation and dissemination of IEC Materials on earthquake awareness and safe construction practices

Click to download

Construction of Earthquake Safer Buildings

English_Piller_poster.jpg
  • The minimum depth of foundation should be up to 1500 mm. 
  • Foundation should not be laid on filling soil and should goes up to original firm soil. 
  • The thickness at side of sloped footing should be minimum of 200 mm. 
  • If columns are located at property line of neighboring plot either combined fo....
    » read more

    Click to download

Earthquake Preparedness Planning for Family

English_Preparedness.jpg

What to Do Before an Earthquake?

  • Fasten shelves securely to wall.
  • Hang heavy items such as pictures and mirrors away from beds, couches, and anywhere people use to sit.
  • Store breakable items such as bottled foods, glass, and ceramics in low, closed cabinets with latches.

Click to download

Earthquake Preparedness Planning for Family

English_Preparedness_Green.jpg

What to Do During an Earthquake?

  • DROP to the ground; take COVER by getting under a sturdy table or other piece of furniture; and HOLD ON until the shaking stops. Move only a few steps to a nearby safe place. Stay indoors until the shaking stops. Make sure that its safe to exit. In a high-rise building, expect the fire alar....
    » read more

    Click to download

Construction of Earthquake Safer Buildings

English_red_Piller.jpg

Reinforcement bars at bottom should not be lapped at mid span of beam and should be lapped at edges 600 mm away from column faces.
Reinforcement bars at top should be lapped at mid 1/3 of span of beam.
The lapping length should be 60 times the diameter of reinforcement bars (for concrete mix 1:2:4). The spacing of vertical stir....
» read more

Click to download

Construction of Earthquake Safer Buildings

English_Purple_Piller.jpg

For Load Bearing Wall System Buildings up to three stories

For one storied building, the recommended size of foundations are as follows:

  • Width 750 mm and depth 800 mm for brick masonry with cement mortar.
  • Width 750 mm and depth 800 mm for stone masonry in cement mortar.
  • Width 850 mm and depth 80....
    » read more

    Click to download

Project Activity : Booklet

Project_booklet.jpg
This project is a part of a fi ve country regional programme in South Asia that seeks to support regional cooperation through knowledge sharing and development of best practices in the context of the SAARC Comprehensive Framework on Disaster Management agreed in February 2006.
Click to download

Instruction for constructing earthquake resistant Building

garowala.jpg
Instructions for constructing a three stories garowala earthquake resistant building
Click to download

Instruction for constructing a earthquake resistant piller building

piller.jpg
Instruction for constructing a earthquake resistant piller building
Click to download

ERRRP Poster

errrp-poster.jpg

Government of Nepal
Ministry of Physical Planning and Works
Earthquake Risk Reduction and Recovery Preparedness Program for Nepal
(UNDP/ERRRP-Project: NEP/07/010)
Department of Urban Development and Building Construction
Babar Mahal, Kathmandu, Nepal
Ph. (977-1) 4262474


Click to download

ERRRP Booklet Final

ERRRP_Booklet_final.jpg

(Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal)

(UNDP/ ERRRP-Project: NEP/07/010)


Click to download

ERRRP Brochure

errrp-brochure.jpg

The program is designed in the context of the International Recovery Platform (IRP) for the fulfillment of the Hyogo Framework for Action (HFA) 2005-2015: Building the resilience of nations and communities to disaster. Taking into account, the South Asian Association for Regional Cooperation (SAARC) has developed risk reduction strategies based ....
» read more

Click to download

ERRRP Leaflet

leaflet.jpg

Implementing Organizations and it's role

This being a National Implementation (NIM) project of UNDP, the implementation responsibility of the project will be with the Government of Nepal. From the perspective of project management the following government organizations will be involved :-